RANDGOLD RESOURCES LTD | CIK:0001175580 | 3

  • Filed: 3/29/2018
  • Entity registrant name: RANDGOLD RESOURCES LTD (CIK: 0001175580)
  • Generator: DataTracks
  • SEC filing page: http://www.sec.gov/Archives/edgar/data/1175580/000114420418017952/0001144204-18-017952-index.htm
  • XBRL Instance: http://www.sec.gov/Archives/edgar/data/1175580/000114420418017952/gold-20171231.xml
  • XBRL Cloud Viewer: Click to open XBRL Cloud Viewer
  • EDGAR Dashboard: https://edgardashboard.xbrlcloud.com/edgar-dashboard/?cik=0001175580
  • Open this page in separate window: Click
  • ifrs-full:DescriptionOfAccountingPolicyForMeasuringInventories

    Inventories
     
    Inventories include ore stockpiles, gold in process and dóre supplies, stores and materials, and are stated at the lower of cost or net realizable value. The cost of ore stockpiles and gold produced is determined principally by the weighted average cost method using related production costs.
     
    Cost of ore stockpiles include costs incurred up to the point of stockpiling, such as mining and grade control costs, but exclude future costs of production. Ore extracted is allocated to stockpiles based on estimated grade, with grades below defined cut-off levels treated as waste and expensed. While held in physically separate stockpiles, the group blends the ore from each stockpile at an individual mine when feeding the processing plant to achieve the resultant gold content. In such circumstances, lower and higher grade ore stockpiles each represent a raw material, used in conjunction with each other, to deliver overall gold production, as supported by the relevant feed plan.
     
    Morila’s full grade ore stockpile was depleted in 2015. At Loulo, full grade open pit stockpile material is above 3.0g/t for Loulo and marginal ore 1.58g/t for Gara, while Yalea is above 0.7g/t.  No Yalea or Gara underground material is on the stockpile since all ore mined is fed.  At Gounkoto, the full grade ore stockpile is above 2.58 g/t and marginal ore above 1.09g/t.  Tongon’s full grade ore stockpile is above 1.34g/t and marginal ore above 0.79g/t, while Kibali’s high and medium grade ore stockpile is above 1.53g/t with a marginal ore cut-off grade of 0.99g/t.
     
    The processing of ore in stockpiles occurs in accordance with the Life of Mine (LoM) processing plan that has been optimized based on the known mineral reserves, current plant capacity and mine design. Ore tonnes contained in the stockpile which exceed the annual tonnes to be milled as per the mine plan in the following year, are classified as non-current in the statement of financial position.
     
    The net realizable value of ore stockpiles is determined with reference to estimated contained gold and market gold prices applicable. Ore stockpiles which are blended together or with future ore mined when fed to the plant are assessed as an input to the gold production process to ensure the combined stockpiles are carried at the lower of cost and net realizable value. Ore stockpiles which are not blended in production are assessed separately to ensure they are carried at the lower of cost and net realizable value, although no such stockpiles are currently held.
     
    Costs of gold inventories include all costs incurred up until production of an ounce of gold such as milling costs, mining costs and directly attributable mine general and administration costs but exclude transport costs, refining costs and royalties. Net realizable value is determined with reference to estimated contained gold and market gold prices.
     
    Stores and materials consist of consumable stores and are valued at weighted average cost after appropriate impairment of redundant and slow moving items. Consumable stock for which the group has substantially all the risks and rewards of ownership are brought onto the statement of financial position as current assets.