TURKCELL ILETISIM HIZMETLERI A S | CIK:0001071321 | 3

  • Filed: 3/22/2018
  • Entity registrant name: TURKCELL ILETISIM HIZMETLERI A S (CIK: 0001071321)
  • Generator: Donnelley Financial Solutions
  • SEC filing page: http://www.sec.gov/Archives/edgar/data/1071321/000119312518092288/0001193125-18-092288-index.htm
  • XBRL Instance: http://www.sec.gov/Archives/edgar/data/1071321/000119312518092288/tkc-20171231.xml
  • XBRL Cloud Viewer: Click to open XBRL Cloud Viewer
  • EDGAR Dashboard: https://edgardashboard.xbrlcloud.com/edgar-dashboard/?cik=0001071321
  • Open this page in separate window: Click
  • ifrs-full:DescriptionOfAccountingPolicyForProvisionsExplanatory

    (s) Provisions

    A provision is recognized if, as a result of a past event, the Group has a present legal or constructive obligation that can be estimated reliably, and it is probable that an outflow of resources will be required to settle the obligation.

    Where there are a number of similar obligations, the likelihood that an outflow will be required in settlement is determined by considering the class of obligations as a whole. A provision is recognized even if the likelihood of an outflow with respect to any one item included in the same class of obligations may be small.

    Provisions are measured at the present value of management’s best estimate of the expenditure required to settle the present obligation at the end of the reporting period. The discount rate used to determine the present value is a pre-tax rate that reflects current market assessments of the time value of money and the risks specific to the liability. The increase in the provision due to the passage of time is recognized as interest expense.

    Onerous contracts

    Present obligation arising under an onerous contract is recognized and measured as a provision. An onerous contract is considered to exist where the Group has a contract under which the unavoidable costs of meeting the obligations under the contract exceed the economic benefits expected to be received under it.

     

    Dismantling, removal and restoring sites obligation

    The Group is required to incur certain costs in respect of a liability to dismantle and remove assets and to restore sites on which the assets were located. The dismantling costs are calculated according to best estimate of future expected payments discounted at a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the liability.