2.9 Property, plant and equipment
Property, plant and equipment, other than construction in progress (“CIP”), are stated at cost less accumulated depreciation and any impairment losses. When an item of property, plant and equipment is classified as held for sale or when it is part of a disposal group classified as held for sale, it is not depreciated and is accounted for in accordance with IFRS 5. The cost of an item of property, plant and equipment comprises its purchase price and any directly attributable costs of bringing the asset to its working condition and location for its intended use.
Expenditure incurred after items of property, plant and equipment have been put into operation, such as repairs and maintenance, is normally charged to profit or loss in the period in which it is incurred. In situations where the recognition criteria are satisfied, the expenditure for a major inspection is capitalised in the carrying amount of the asset as a replacement. Where significant parts of property, plant and equipment are required to be replaced at intervals, the Group recognizes such parts as individual assets with specific useful lives and depreciates them accordingly.
Depreciation is calculated on the straight-line basis to write off the cost of each item of property, plant and equipment to its residual value over its estimated useful life. The principal annual rates used for this purpose are as follows:
Buildings |
|
8 |
- |
45 |
years |
Machinery |
|
3 |
- |
30 |
years |
Transportation facilities |
|
6 |
- |
10 |
years |
Office and other equipment |
|
3 |
- |
10 |
years |
The depreciation method, residual values and useful lives are reviewed and adjusted, if appropriate, at the end of each reporting period. An item of property, plant and equipment including any significant part initially recognized is derecognized upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss on disposal or retirement recognized in profit or loss in the year the asset is derecognized is the difference between the net sales proceeds and the carrying amount of the relevant asset.
CIP represents buildings under construction, and plant and equipment pending for installation, and is stated at cost less any impairment losses. Cost comprises construction expenditures, other expenditures necessary for the purpose of preparing the CIP for its intended use and those borrowing costs incurred before the asset is ready for its intended use that is eligible for capitalization. CIP is transferred to property, plant and equipment when the CIP is ready for its intended use.