GOLD FIELDS LTD | CIK:0001172724 | 3

  • Filed: 4/23/2018
  • Entity registrant name: GOLD FIELDS LTD (CIK: 0001172724)
  • Generator: Donnelley Financial Solutions
  • SEC filing page: http://www.sec.gov/Archives/edgar/data/1172724/000119312518126269/0001193125-18-126269-index.htm
  • XBRL Instance: http://www.sec.gov/Archives/edgar/data/1172724/000119312518126269/gfi-20171231.xml
  • XBRL Cloud Viewer: Click to open XBRL Cloud Viewer
  • EDGAR Dashboard: https://edgardashboard.xbrlcloud.com/edgar-dashboard/?cik=0001172724
  • Open this page in separate window: Click
  • ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory

    4. PROPERTY, PLANT AND EQUIPMENT

     

    4.1 Mine development and infrastructure

    Mining assets, including mine development and infrastructure costs and mine plant facilities, are recorded at cost less accumulated depreciation and accumulated impairment losses.

    Expenditure incurred to evaluate and develop new orebodies, to define mineralisation in existing orebodies and to establish or expand productive capacity, is capitalised until commercial levels of production are achieved, at which times the costs are amortised as set out below.

    Development of orebodies includes the development of shaft systems and waste rock removal that allows access to reserves that are economically recoverable in the future. Subsequent to this, costs are capitalised if the criteria for recognition as an asset are met.

     

    4.2 Borrowing costs

    Borrowing costs incurred in respect of assets requiring a substantial period of time to prepare for their intended future use are capitalised to the date that the assets are substantially completed.

     

    4.3 Mineral and surface rights

    Mineral and surface rights are recorded at cost less accumulated amortisation and accumulated impairment losses. When there is little likelihood of a mineral right being exploited, or the fair value of mineral rights has diminished below cost, an impairment loss is recognised in profit or loss in the year that such determination is made.

     

    4.4 Land

    Land is shown at cost and is not depreciated.

     

    4.5 Other assets

    Non-mining assets are recorded at cost less accumulated depreciation and accumulated impairment losses. These assets include the assets of the mining operations not included in mine development and infrastructure, borrowing costs, mineral and surface rights and land and all the assets of the non-mining operations.

     

    4.6 Amortisation and depreciation of mining assets

    Amortisation and depreciation is determined to give a fair and systematic charge to profit or loss taking into account the nature of a particular ore body and the method of mining that ore body. To achieve this, the following calculation methods are used:

     

        Mining assets, including mine development and infrastructure costs, mine plant facilities and evaluation costs, are amortised over the life of the mine using the units-of-production method, based on estimated proved and probable ore reserves;

     

        Stripping activity assets are amortised on a units-of-production method, based on the estimated proved and probable ore reserves of the ore body to which the assets relate; and

     

        The mineral rights asset at the Australian operations are divided at the respective operations into a depreciable and a non-depreciable component. The mineral rights asset is initially capitalised to the mineral rights asset as a non-depreciable component.

    Subsequently, and on an annual basis, as part of the preparation of the updated reserve and resource statement and preparation of the updated life-of-mine plan, a portion of resources will typically be converted to reserves as a result of ongoing resource definition drilling, resultant geological model updates and subsequent mine planning. Based on this conversion of resources to reserves a portion of the historic cost is allocated from the non-depreciable component of the mineral rights asset to the depreciable component of the mineral rights asset. Therefore, the category of non-depreciable mineral rights asset is expected to reduce and will eventually be fully allocated within the depreciable component of the mineral rights asset.

    Each operation typically comprises a number of mines and the depreciable component of the mineral rights asset is therefore allocated on a mine-by-mine basis at the operation and is transferred at this point to mine development and infrastructure and is then amortised over the estimated proved and probable ore reserves of the respective mine on the units-of-production method. The remaining non-depreciable component of the mineral rights asset is not amortised but, in combination with the depreciable component of the mineral rights asset and other assets included in the CGU, is evaluated for impairment when events and changes in circumstances indicate that the carrying amount may not be recoverable.

    Proved and probable ore reserves reflect estimated quantities of economically recoverable reserves, which can be recovered in future from known mineral deposits.

    Certain mining plant and equipment included in mine development and infrastructure is depreciated on a straight-line basis over the lesser of their estimated useful lives or life-of-mine.

    Correction of amortisation for Australian mineral rights asset

    During the year ended 31 December 2017, the Group corrected the amortisation methodology for the mineral rights asset at the Australian operations to reduce the level of estimation uncertainty required in calculating amortisation. Prior to the correction of methodology, the total mineral rights asset capitalised at the Australian operations was amortised on a units-of-production basis over a useful life that exceeded proved and probable reserves. The revised amortisation methodology for the mineral rights assets is set out on page 144.

    At 1 January 2017, as a result of this correction of methodology, management identified an understatement of the amortisation and depreciation charge in prior periods. The understatement has been corrected by restating each of the affected financial statement line items for prior periods (refer note 40 for further details).

    The impact of the correction of the amortisation methodology resulted in an increase in amortisation of US$5.7 million for the 2017 year.

     

    4.7 Depreciation of non-mining assets

    Non-mining assets are recorded at cost and depreciated on a straight-line basis over their current expected useful lives to their residual values as follows:

     

        Vehicles – 20%

     

        Computers – 33.3%

     

        Furniture and equipment – 10%

    The assets’ useful lives, depreciation methods and residual values are reassessed at each reporting date and adjusted if appropriate.

     

    4.8 Mining exploration

    Expenditure on advances solely for exploration activities is charged against profit or loss until the viability of the mining venture has been proven. Expenditure incurred on exploration “farm-in” projects is written off until an ownership interest has vested. Exploration expenditure to define mineralisation at existing ore bodies is considered mine development costs and is capitalised until commercial levels of production are achieved.

    Exploration activities at certain of the Group’s non-South African operations are broken down into defined areas within the mining lease boundaries. These areas are generally defined by structural and geological continuity. Exploration costs in these areas are capitalised to the extent that specific exploration programmes have yielded targets and/or results that warrant further exploration in future years.

     

    4.9 Impairment

    Recoverability of the carrying values of long-term assets or CGUs of the Group are reviewed annually or whenever events or changes in circumstances indicate that such carrying values may not be recoverable. To determine whether a long-term asset or CGU may be impaired, the higher of “value in use” (defined as: “the present value of future cash flows expected to be derived from an asset or CGU”) or “fair value less costs of disposal” (defined as “the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date”) is compared to the carrying value of the asset/CGU. Impairment losses are recognised in profit or loss.

    A CGU is defined by the Group as the smallest identifiable group of assets that generates cash inflows that are largely independent of the cash inflows from other assets or groups of assets. Generally for the Group this represents an individual operating mine, including mines which are part of a larger mine complex. The costs attributable to individual shafts of a mine are impaired if the shaft is closed.

    Exploration targets in respect of which costs have been capitalised at certain of the Group’s international operations are evaluated on an annual basis to ensure that these targets continue to support capitalisation of the underlying costs. Those that do not are impaired.

    When any infrastructure is closed down during the year, any carrying value attributable to that infrastructure is impaired.

     

    4.10 Gain or loss on disposal of property, plant and equipment

    Any gain or loss on disposal of property, plant and equipment (calculated as the net proceeds from disposal less the carrying amount of the item) is recognised in profit or loss.

     

    4.11 Leases

    At the inception of an arrangement, the Group determines whether the arrangement contains a lease. Leases that transfer to the Group substantially all of the risks and rewards of ownership are classified as finance leases. All other leases are classified as operating leases and are not recognised in the statement of financial position.

    Operating lease costs are charged against profit or loss on a straight-line basis over the period of the lease.

     

    4.12 Deferred stripping

    Production stripping costs in a surface mine are capitalised to property, plant and equipment if, and only if, all of the following criteria are met:

     

        It is probable that the future economic benefit associated with the stripping activity will flow to the entity;

     

        The entity can identify the component of the ore body for which access has been improved; and

     

        The costs relating to the stripping activity associated with that component can be measured reliably.

    If the above criteria are not met, the stripping costs are recognised directly in profit or loss.

    The Group initially measures the stripping activity asset at cost, this being the accumulation of costs directly incurred to perform the stripping activity that improves access to the identified component of ore.

    After initial recognition, the stripping activity asset is carried at cost less accumulated amortisation and accumulated impairment losses.