RANDGOLD RESOURCES LTD | CIK:0001175580 | 3

  • Filed: 3/29/2018
  • Entity registrant name: RANDGOLD RESOURCES LTD (CIK: 0001175580)
  • Generator: DataTracks
  • SEC filing page: http://www.sec.gov/Archives/edgar/data/1175580/000114420418017952/0001144204-18-017952-index.htm
  • XBRL Instance: http://www.sec.gov/Archives/edgar/data/1175580/000114420418017952/gold-20171231.xml
  • XBRL Cloud Viewer: Click to open XBRL Cloud Viewer
  • EDGAR Dashboard: https://edgardashboard.xbrlcloud.com/edgar-dashboard/?cik=0001175580
  • Open this page in separate window: Click
  • ifrs-full:DescriptionOfAccountingPolicyForPropertyPlantAndEquipmentExplanatory

    Property, plant and equipment
     
    Long-lived assets and mine development costs
     
    Long-lived assets including development costs and mine plant facilities (such as processing plants, tailings facilities, raw water dams and power stations) are initially recorded at cost. Development of orebodies includes the development costs of shaft systems and waste rock removal that allows access to reserves that are economically recoverable in the future. Costs associated with underground development are capitalized when the works provide access to the orebody, whereas costs associated with ore extraction from operating orebody sections are treated as operating costs. Where relevant the estimated cost of dismantling the asset and remediating the site is included in the cost of property, plant and equipment, subsequently they are measured at cost less accumulated amortization and impairment.
     
    Development costs consist primarily of direct expenditure incurred to establish or expand productive capacity.
     
    Costs are capitalized during the construction of a new mine until commercial levels of production are achieved (refer to ‘Commercial production’ below), after which the relevant costs are depreciated. Costs are capitalized provided that the project is considered to be commercially, technically and economically viable. Such viability is deemed to be achieved when the group is confident that the project will provide a satisfactory return relative to its perceived risks and is sufficiently certain of economic production. Costs which are necessarily incurred while commissioning new assets, in the period before they are capable of operating in the manner intended by management, are capitalized under ‘Long-lived assets and mine development costs’.
     
    Development costs incurred after the commencement of production are capitalized to the extent they are expected to give rise to a future economic benefit.
     
    Commercial production
     
    The group assesses the stage of each mine construction project to determine when a mine moves into the production stage. The criteria used to assess the start date are determined by the unique nature of each mine construction project and include factors such as the complexity of a plant and its location. The group considers various relevant criteria to assess when the mine construction project is substantially complete and ready for its intended use and moves into the production stage. Some of the criteria would include but are not limited to the following:
     
    • The level of capital expenditure compared to construction cost estimates;
     
    • Completion of a reasonable period of testing of the mine plant and equipment;
     
    • The ability to produce gold in saleable form; and
     
    • The ability to sustain commercial levels of gold production.
     
    When a mine construction project moves into the production stage, the capitalization of certain mine construction costs ceases and subsequent costs are either regarded as inventory or expensed, except for capitalizable costs related to subsequent mining asset additions or improvements, open cast stripping, underground mine development or ore reserve development.
     
    The commissioning of an underground mine typically occurs in phases, with sections brought into production while deeper levels remain under construction. The shared infrastructures, such as declines of shafts, are assessed to determine whether they contribute to the production areas. Where they contribute to production, the attributable costs are transferred to production assets and start to be depreciated. The costs transferred comprise costs directly attributable to producing zones or, where applicable, estimates of the portion of shared infrastructure that are attributed to the producing zones.
     
    Development expenditure approval
     
    Development activities commence after project sanctioning by the appropriate level of management. Judgment is applied by management in determining when a project has reached a stage at which economically recoverable reserves exist such that development may be sanctioned. In exercising this judgment, management is required to make certain estimates and assumptions similar to those described below for capitalized exploration and evaluation expenditure. Any such estimates and assumptions may change as new information becomes available.
     
    Stripping costs
     
    In surface mining operations, the group may find it necessary to remove waste materials to gain access to mineral ore deposits prior to and after production commences. This waste removal activity is known as ‘stripping’. Prior to production commencing from a pit, stripping costs are measured internally and capitalized until the point where the overburden has been removed and access to the ore commences. Subsequent to production, waste stripping continues, either as part of ore extraction as a run of mine activity or due to strategic decisions such as pit push-back campaigns. There are two benefits accruing to the group from stripping activity during the production phase: usable ore that can be used to produce inventory and improved access to further quantities of material that will be mined in future periods. Economic ore extracted during this period and subsequently is accounted for as inventory. The production stripping costs relating to improved access to further quantities in future periods are capitalized as a stripping activity asset, if and only if, all of the following are met:
     
    • It is probable that the future economic benefit (improved access to the orebody) associated with the stripping activity will flow to the group;
     
    • The group can identify the component of the orebody for which access has been improved; and
     
    • The costs relating to the stripping activity associated with that component or components can be measured reliably.
     
    In determining the relevant component of the orebody for which access is improved, the group componentizes each of its mines into geographically distinct orebody sections or phases to which the stripping activities being undertaken within that component are allocated. Such phases are determined based on assessment of factors such as geology and mine planning.
     
    Once determined that any portion of the production stripping costs should be capitalized, the group typically uses the average stripping ratio of the component or phase of the mine to which the production stripping cost related to determine the amount of the production stripping costs that should be capitalized, unless the direct costs of stripping activity can be separately identified in which case such costs are capitalized.
     
    The group depreciates the deferred costs capitalized as stripping assets on a unit of production method, with reference to the ex-pit ore treated from the relevant orebody component or phase.
     
    Short-lived assets
     
    Short-lived assets including non-mining assets are shown at cost less accumulated depreciation and impairment.
     
    Depreciation and amortization
     
    Long-lived assets include mining properties, such as metallurgical plant, tailings and raw water dams, power plant and mine infrastructure, as well as mine development costs and are depreciated on a unit of production basis.
     
    Depreciation and amortization are charged over the life of the mine (or over the remaining useful life of the asset, if shorter) based on estimated ore tonnes contained in proven and probable reserves to be extracted using the relevant asset. As an example, underground assets are depreciated over underground proven and probable reserves and tonnes milled from those orebodies. No future capital expenditure is included in the depreciable value. Proven and probable ore reserves reflect estimated quantities of economically recoverable reserves, which can be recovered in the future from known mineral deposits. Only proven and probable reserves are used in the tonnes milled units of production depreciation calculation. Any changes to the expected life of the mine (or asset) are applied prospectively in calculating depreciation and amortization charges.
     
    Depreciation of construction and development costs for new mines commences when commercial production is achieved, as detailed above. Underground development costs that are attributable to the commissioned sections of an underground mine are depreciated from the date the development provides access to operational areas and ore extraction begins from those areas. Other assets under construction, such as plant improvement projects, are depreciated from the date they are commissioned, based on assessment by the group’s engineers.
     
    Short-lived assets which include motor vehicles, office equipment and computer equipment are depreciated over estimated useful lives of between two to five years but limited to the remaining mine life. Residual values and useful lives are reviewed, and adjusted if appropriate, at each statement of financial position date. Changes to the estimated residual values or useful lives are accounted for prospectively. Depreciation starts when the assets are ready and available for use.
     
    Impairment
     
    The carrying amount of the property, plant and equipment and investments in joint ventures of the group is compared to the recoverable amount of the assets whenever events or changes in circumstances indicate that the net book value may not be recoverable. The recoverable amount is the higher of value in use and the fair value less cost to sell. In assessing the value in use, the expected future cash flows from the assets is determined by applying a discount rate to the anticipated risk adjusted future cash flows. The discount rate used is the group’s weighted average cost of capital adjusted for asset specific factors when applicable. An impairment is recognized in the income statement to the extent that the carrying amount exceeds the assets’ recoverable amount. Only proven and probable reserves are used in the calculations and the models use the approved mine plans and exclude capital expenditure which enhance the assets or extractable ore tonnes outside of such approved mine plans. The revised asset carrying amounts are depreciated in line with group accounting policies. Assets are grouped at the lowest levels for which there are separately identifiable cash flows (cash-generating units) for purposes of assessing impairment. The estimates of future discounted cash flows are subject to risks and uncertainties including the future gold price. It is therefore reasonably possible that changes could occur which may affect the recoverability of property, plant and equipment and investments in joint ventures.
     
    A previously recognized impairment loss is reversed if the recoverable amount increases as a result of a reversal of the conditions that originally resulted in the impairment. This reversal is recognized in the income statement and is limited to the carrying amount that would have been determined, net of depreciation, had no impairment loss been recognized in prior years.